Planning guide

What to decide before ordering a boat wash station.

Equipment selection follows the journey, site, utilities and responsibilities. This checklist prepares the validations that prevent surprises during installation.

Back to the resource centre
Preparation of an access lane and equipment base

Introduction

A specification sheet does not answer operating questions

A station may be technically compatible but still fail operationally if a trailer cannot manoeuvre, water cannot drain or no one owns an after-hours call. Planning checks those dependencies before purchase.

Download the planning worksheets
Context

1 — Describe the service

Who uses the station, in what order and under which policy?

List user classes, periods, any payment, required steps and exceptions. Describe one normal visit and at least three difficult cases: a new user, incomplete record and unavailable equipment.

  • Resident, visitor, employee or vendor
  • Watercraft and trailer identification
  • Instructions and languages
  • In-hours and after-hours support
Decision

2 — Check the site

Trace the movement of a vehicle and trailer.

On a plan, mark arrival, queue, wash, exit and launch. Confirm turning radii, slopes, pedestrian conflicts, clearances and maintenance access.

Then identify water, drainage, power, network, lighting, anchoring, physical protection and seasonal conditions. Give each prerequisite an owner and validation date.

Implementation

3 — Define operations

Plan maintenance before opening.

Establish inspection, cleaning, replenishment, seasonal closure, user support and outage response. State what local staff may correct and when a technician or Lexoh needs to intervene.

Takeaway

4 — Prepare procurement

Compare equivalent scopes.

A proposal should separate equipment, software, installation, civil work, utilities, connections, training, support, recurring items and exclusions. Interfaces with existing equipment need confirmation, not assumption.

Section 5

5 — Test before opening

Run actual scenarios.

Tests cover normal use, denial, retry, network loss, device failure and authorized entry for staff or emergency services. Signage and support information are checked from the user’s position.

FAQ

Questions covered

01When is a site visit needed?

Before final scope where utilities, drainage, traffic or an existing integration matter. Plans and photographs help with definition but cannot reveal every constraint.

02Who validates environmental wash requirements?

The organization should consult the appropriate authorities and experts for its jurisdiction. Lexoh configures and integrates the selected journey; it does not replace that validation.

03Is Internet service required?

Communication needs depend on functions and site. Connectivity, reliability and fallback are part of the assessment.

Next step

Use the site plan as a starting point.

We can annotate movement, utilities and the validations that remain.